Works estimation · Tendering · Agreements · Billing — one platform contact@estimotor.online

The whole life of a work, in one application.

eTAB Works-Estimator™ carries an engineering work through every stage of its file: preliminary estimate, detailed estimate with full analysis of rates, DNIT and standard bidding documents, the agreement, running-account and final bills, and escalation claims at the end — with each stage reading its figures from the stage before it, so nothing is re-typed and nothing quietly drifts.

Estimotor also hosts free estimating resources — quantity calculators, material-consumption norms, an IS-code directory and escalation indices — open to every engineer, no sign-in needed.

  • 1 Preliminary Estimate — plinth-area costing, cost index applied
  • 2 Detailed Estimate — schedule items, details of measurement, analysis of rates
  • 3 DNIT / SBD — notice, Schedule 'F', earnest money, BoQ
  • 4 Agreement — tendered premium/rebate locked into rates
  • 5 RA & Final Bills — measurements, deviations, recoveries
  • 6 Escalation Claims — Clause 10C · 10CA · 10CC

What the name stands for

EEstimating SSchedules of Rates TTendering IItem Analysis MMeasurement OOversight TTransparency OOnline RReporting

Accurate Estimates · Fair Tenders · Timely Bills

LATEST
6
Workflow stages, estimate to escalation
30+
Reports & statements — PDF and Excel
3
Escalation clause types — 10C · 10CA · 10CC
20+
Free calculators & reference pages

Featured Services

What comes with the software, beyond the software.

Backup & Support

Your work stays yours — simple project backup and restore, with support from people who know works estimation.

Customizable Solution

Your organisation's name and logo on every report, your own schedules of rates, your office's registers and formats.

Automatic Updates

The web edition is always the latest version; desktop updates install over the old one without touching your projects.

User Friendly

Screens that follow the works file — estimate, DNIT, agreement, bill — the way an engineering office actually thinks.

LAN, Multiuser & Standalone

Run standalone on one PC, or as organisation accounts on the web with per-user sign-in, seats and a single editor per project.

FREE RESOURCES

Open reference tools for the estimating engineer

No account, no charge — quick checks you can trust while the file is open on your desk.

🧮

Quantity Calculators

Concrete, brickwork, steel, earthwork, flooring & paint, and unit converters — each with the working shown, so you can defend the figure in a check-measurement.

Open calculators →
🧱

Material Consumption

Per-unit cement, sand, aggregate and steel norms for the common items of work — the numbers you reach for when framing a theoretical-consumption statement.

See the norms →
📖

IS-Code Directory

The Indian Standards an estimator actually cites — materials, concrete, steel, masonry, safety — grouped by subject with a line on what each one governs.

Browse the directory →
📈

Indices & Escalation

How cost indices and price-variation clauses work, with worked examples of Clause 10C, 10CA and 10CC claims and where each figure comes from.

Study escalation →
✍️

Articles

Working notes from the estimator's chair — preparing a detailed estimate, building a rate analysis, passing an RA bill, handling deviations.

Read the articles →
🗂️

Downloads & Proformas

Printable measurement-sheet and bill-checking proformas, CSV templates, and the desktop-edition installer request — all in one place.

Get the downloads →

Everything the works office does — as modules

One data spine from sanction to final payment. Each module hands its output to the next.

📐

Preliminary Estimate

Plinth-area based costing with services and development charges, brought to current level through the cost index — a sanction-ready PE without a spreadsheet.

Open in app →
📋

Detailed Estimate

Items picked from the schedule of rates, quantities entered as details of measurement, and the abstract of cost assembling itself as you work.

Open in app →
⚖️

Analysis of Rates

Rate build-up from labour, material and machinery basics — for schedule items, market-rate justification and non-schedule items alike.

Open in app →
📄

DNIT & SBD

Notice inviting tender, Schedule 'F', earnest money and the standard bidding document, all generated from the approved estimate — plus the e-procurement BoQ.

Open in app →
🖋️

Agreement

The tendered premium or rebate is applied once and locked; agreement rates then flow into every bill, so the contract is quoted, never re-typed.

Open in app →
🧾

RA & Final Bills

Running-account bills with measurements, part-rate payments, extra and substitute items, deviation statements, secured advance and material recovery.

Open in app →
📈

Escalation Claims

Clause 10C labour, 10CA specified-material and 10CC index-based claims, computed from the bills already recorded — not from a side spreadsheet.

How escalation works →
🗃️

Office Registers

Agreement, bill and service-order registers with a document library and the full set of office reports, kept alongside the works themselves.

Open in app →

Two editions, one computation engine

Desktop and web run the same estimating core — the same work gives the same paisa on both.

Desktop Edition

For the individual engineer and the single-office installation
  • Works fully offline — no internet needed after installation
  • Your estimates and bills stay on your own PC
  • Machine-licensed — activation tied to your computer
  • Complete report set with print preview and Excel export
Get Desktop Edition

Web Edition

For departments and organisations working as a team
  • Organisation accounts with per-user sign-in and seats
  • Browser-based — nothing to install, work from anywhere
  • Single editor per project at a time — no overwritten work
  • Administrator view with a usage audit of who did what
Open Web Edition →

Reports that match the file, page for page

Every statement is generated from the recorded data and exports to PDF and Excel under your organisation's letterhead and logo.

Abstract of Cost Details of Measurement Analysis of Rates Justification Statement Schedule 'F' Bill Abstract Memorandum of Payment Deviation Statement Extra & Substitute Item Statements Secured Advance Statement Material Recovery / Theoretical Consumption Escalation Statements — 10C · 10CA · 10CC Revised Estimate Cost Comparison Office Registers & more…

Bring your works file into one application

Whether you are one engineer preparing estimates or a department moving its whole works cycle online, write to us — we will walk you through a live work on your own schedule of rates, from preliminary estimate to a running bill.