Civil Engineering Calculators

Quick quantity checks for the site office — concrete, brickwork, steel, earthwork, finishing and unit conversion. Handy when you are framing a rough cost, vetting a contractor's claim, or checking a line of the details of measurement before it goes into the abstract.

Pick a calculator group

Six pages, eighteen-odd calculators. Each one shows its working — the formula, the constants used and a worked breakdown — so you can defend the figure in front of a checking officer, not just quote it.

🏗️

Concrete & Mortar

Nominal mixes M5 (1:5:10) through M25 (1:1:2) with the 1.54 dry-volume factor; mortar and plaster on the 1.33 factor.

  • Concrete quantities by mix — cement bags, sand, coarse aggregate
  • Cement-mortar quantities for any mix ratio
  • Plaster estimator — area × thickness, dubbing allowance
Open concrete calculators →
🧱

Brickwork

Modular-brick masonry on the 500 bricks/m³ norm with wet-mortar volume worked out separately, so brick and mortar tallies agree.

  • Bricks & mortar for a given volume of brickwork
  • Wall quantity from length × height × thickness
  • Cement and sand for the brickwork mortar mix
Open brickwork calculators →
🔩

Reinforcement Steel

Everything hangs on the one relation the trade runs on — unit weight = d²/162 kg/m — for dias 6 to 32 mm.

  • Bar weight from dia and cutting length
  • Bar-bending-schedule style total for multiple bar marks
  • Bars per tonne / running metres per tonne
Open steel calculators →
⛏️

Earthwork

Excavation and filling quantities the way they are booked in the measurement book — trench, pit and sloped-side sections.

  • Trench / foundation excavation volume
  • Trapezoidal section with side slopes
  • Filling, compaction and lead-lift quick checks
Open earthwork calculators →
🎨

Flooring & Paint

Finishing quantities — tile counts with wastage, and paint on typical coverage rates (always cross-check the maker's datasheet).

  • Floor tiles for a room, with skirting and wastage
  • Paint litres by surface, coats and coverage
  • Primer and enamel on their own coverage bands
Open flooring & paint calculators →
🔁

Unit Converters

The conversions that keep turning up between old plinth-area records, market quotations and metric estimates.

  • Length / area / volume — m ↔ ft, m² ↔ ft², m³ ↔ cft
  • Pressure — kg/cm² ↔ N/mm²
  • Weight — kg, quintal, metric tonne
Open converters →
🧾

GST Correction Factor

Why CPWD's revised order makes a DSR 2023 rate fall by 2.7 %, worked on your own base figure — and how the statutory deductions come back out of a gross bill.

  • The 0.973 factor — both build-ups, side by side
  • GST, labour welfare cess and TDS on gross work done
Open GST calculators →
One set of constants across every page. All calculators on Estimotor run on the same canonical figures — dry-volume factor 1.54 for concrete and 1.33 for mortar, a 50 kg cement bag taken as 0.0347 m³ (28.8 bags/m³), steel at d²/162 kg per metre, 500 modular bricks per m³ of masonry, and the standard metric–FPS conversion factors. So a quantity you work out on the concrete page will reconcile with the cement figure on the material consumption page, and with what the steel page tells you for the same member. No page-to-page drift.

From a quick check to a sanctioned estimate

These calculators answer the one-member, one-item question — how much cement in that footing, how many bricks in that wall. For the full chain — detailed estimate with analysis of rates, DNIT, agreement, RA bills with deviation and escalation statements — that is what the eTAB Works-Estimator™ does end to end. And when you need per-unit material norms rather than a computed quantity, the consumption tables carry the standard coefficients for common items of work.

These figures are an educational aid for quick checks. Always verify against your organisation's schedule of rates, the governing IS codes and the contract before use.